New Build Flats Case Study
Thorough Electrical Installation in New Build Flats
This project is a newly developed residential complex comprising 200 apartments, aimed at offering modern, comfortable living spaces in an urban setting. Our company, Scope, was contracted to provide a full suite of electrical installations, including power systems, CCTV, data networking, TV systems, solar power integration, fire detection, and emergency lighting. This extensive project spanned 14 months and presented several unique challenges due to its scale and the integration of advanced technologies.
What Did We Want To Accomplish?
-
Wide-Ranging Electrical Systems: Deliver reliable and efficient power, data, and communication infrastructure.
-
Security and Safety: Install state-of-the-art CCTV and fire detection systems.
-
Sustainability: Incorporate renewable energy solutions, including solar power.
-
Modern Amenities: Provide integrated TV and data systems for all apartments.
-
Compliance and Standards: Ensure all installations meet stringent safety and regulatory standards.
How Did Our Client Benefit?
-
Enhanced Living Experience: Residents of the flats benefit from reliable power, high-speed internet, and modern amenities, enhancing their overall living experience.
​
-
Improved Security: The advanced CCTV system provides comprehensive security coverage, ensuring the safety of residents and property.
​
-
Energy Efficiency: The solar power system helps reduce the building's carbon footprint and energy costs, aligning with sustainable living practices.
​
-
Future-Proof Infrastructure: The installation of modern data and TV systems ensures that the flats are equipped to meet the evolving needs of its residents.
Project Planning and Design
1. Initial Assessment and Planning: Our first step involved a thorough assessment of the site and requirements:
-
Site Survey: Detailed surveys were conducted to understand the building layout and specific electrical needs.
-
Client Consultation: We worked closely with the developers to tailor our installations to the needs of modern urban living, focusing on energy efficiency, security, and connectivity.
-
Regulatory Compliance: Ensuring compliance with local building codes, safety standards, and industry best practices was a key priority from the outset.
2. System Design:
Each component of the electrical installation was meticulously planned:
-
Power Distribution: Designing a robust power distribution network capable of handling the electrical demands of 200 apartments, including provision for future scalability.
-
CCTV and Security: Specifying high-definition cameras and an integrated monitoring system to ensure comprehensive security coverage.
-
Data and TV Systems: Planning for high-speed internet connectivity and digital TV access in every apartment.
-
Solar Power Integration: Designing a solar PV system to supplement the building's power supply, enhance energy efficiency, and reduce overall energy costs.
-
Fire Detection and Emergency Lighting: Implementing a state-of-the-art fire detection system, coupled with emergency lighting to ensure occupant safety during power outages or emergencies.
Installation Process
1. Infrastructure Setup:
-
Cabling and Conduits: Installation of electrical conduits and cabling throughout the building. This phase required precise planning to accommodate power, data, and communication lines without overcrowding or interference.
-
Main Distribution Board (MDB): Installation of the main distribution board and sub-distribution boards, ensuring an organized and efficient distribution of power across the building.
2. System Installations:
-
Power and Lighting: Comprehensive power outlets and lighting systems installation in each apartment, including energy-efficient LED lighting.
-
CCTV System: Installation of cameras at key points, including entrances, exits, hallways, and common areas, with central monitoring.
-
Data and TV: High-speed data cables and TV connections installed in all apartments, ensuring residents have access to the latest technology.
-
Solar Power System: Installation of solar panels on the building’s roof, connected to inverters and integrated with the main power system to supplement electricity supply.
-
Fire Detection and Emergency Lighting: Installation of smoke detectors, alarms, and emergency lighting in compliance with safety regulations.
3. Testing and Commissioning: Once installation was complete, a comprehensive testing phase was conducted:
-
Electrical Safety Testing: Ensuring all electrical systems were safe, compliant, and operational, including insulation resistance and earthing tests.
-
System Performance Tests: Testing the performance of the solar PV system, CCTV, data, and TV systems to ensure they met the required specifications.
-
Fire Safety Compliance: Conducting drills and testing the fire detection and emergency lighting systems to ensure they operated effectively in an emergency.